Certified PCB Screening
Closed-Loop Pumping
Transport and Recycling
We perform certified laboratory testing under EPA 40 CFR 761 to classify mineral insulating oil as non-PCB, PCB-contaminated, or regulated.
Trained technicians connect dedicated high-flow vacuum lines to drain transformer casings safely without moisture infiltration or site contamination.
Bulk tankers transport recovered insulating fluids under complete hazardous or non-hazardous waste manifests to licensed refining and reclamation hubs.
Industrial Compliance by Design
Every transformer oil project adheres to rigorous federal and West Virginia Department of Environmental Protection standards.
Regulatory Manifests
Substation Containment
High-Volume Fleet
Full chain-of-custody tracking provides auditable proof of legal transportation, certified treatment, and closed-loop reclamation.
On-site secondary containment berms and spill response kits protect gravel beds and utility easements during fluid transfer.
Direct deployment of multi-compartment tankers handles utility decommissioning, station refurbishments, and emergency unit drain-downs.
Statewide Liquid Logistics
100%
DEP & EPA Compliant
55
WV Counties Covered
100k
Gallon Project Capacity
24/7
Emergency Fleet Dispatch
Provide your facility location, estimated volume, and PCB status. Our logistics team will review specs and provide a firm collection schedule.


